![]() |
2007 Wild Pointe Phase II Cost: $1,860,713.32 |
Scope: |
The extension of Phase 1B, the work consisted of additional building of paved roadways and shouldering. There were 72,100 yards of cut/fill. 10,000 lineal feet of roadway were constructed. 10,000 feet of pipe were placed ranging in size from |
| download this page (PDF format) |