![]() |
2004 Virginia Canyon Drainage Improvements–Phase II Cost: $296,573.30 |
| Scope: | Located near the famous “Oh My God” road above Idaho Springs, this site was experiencing severe erosion issues from many years of mining activity. Hudick Excavating rehabilitated the drainage channel, installed 3000 CY of rip rap and several sediment control structures. The location in a steep grade made the execution of the work a particular safety challenge. |
| download this page (PDF format) |