![]() |
2005 Stonegate Filing No. 20 Phase B Cost: $1,490,621.08 |
| Scope: | This is a multi-family development during the construction of which, Hudick Excavating moved 60,000 CY of material and exported 35,000 additional yards. HEI also installed 3000 lineal feet of sewer, 3000 lineal feet of water, and 200 lineal feet of storm drain. |
| download this page (PDF format) |