![]() |
2005 Lower Sacramento Creek #1 Dam Cost: $391,353.93 |
| Scope: | Lower Sacramento Creek Dam required 30,000 CY of excavation and 187,000 square feet of PVC liner to complete. Hudick Excavating screened 10,000 CY of material to provide bedding and cover for the liner. This screening process was carefully controlled to exacting specifications. Also, HEI constructed an in-place outlet structure. |
download this page (PDF format) |
|
|
|